{"id":1572,"date":"2010-12-27T09:26:40","date_gmt":"2010-12-27T09:26:40","guid":{"rendered":"http:\/\/localhost\/acegroup_2011\/?p=1572"},"modified":"2012-02-03T11:00:40","modified_gmt":"2012-02-03T11:00:40","slug":"abschluss-der-bauarbeiten-tehran-mu-iran","status":"publish","type":"post","link":"https:\/\/www.acegroup.at\/en\/abschluss-der-bauarbeiten-tehran-mu-iran\/","title":{"rendered":"Completion of Construction Wella &#8211; TMU Iran"},"content":{"rendered":"<p>From 2004 to 2008, the ACE-Group as a general planning group was commissioned to build the Wella factory and Wella studio in Tehran as well as the logistics center of Tehran Mu \u2013 Wella Iran.<!--more--><\/p>\n<p>An industrial and logistics center was built with special regard to sterility and dust-free conditions similar to the pharmaceutical industry. This factory with high-quality standards was implemented in a region which does not usually provide any infrastructure of the kind.<\/p>\n<p>Supervision in the following areas was part of the project:<\/p>\n<ul>\n<li>Scheduling, Timing and Cost Calculation: the ACE-Group guarantees for the objectives to be achieved<\/li>\n<li>Quality Control: one of our most important tasks<\/li>\n<li>Coordination of activities on site<\/li>\n<li>Cost Control and Invoice Check<\/li>\n<li>Work Inspection, Rectification and End-User handover<\/li>\n<li>All constructions on site were commissioned by the ACE-Group<\/li>\n<\/ul>\n<p>Additionally, the ACE-Group rendered an exceptional service in supervising the building process of the factory, the material handling and the filling machines.<\/p>","protected":false},"excerpt":{"rendered":"<p>From 2004 to 2008, the ACE-Group as a general planning group was commissioned to build the Wella factory and Wella studio in Tehran as well as the logistics center of Tehran Mu \u2013 Wella Iran.<\/p>\n","protected":false},"author":1,"featured_media":1575,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12,7],"tags":[],"class_list":["post-1572","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nachhaltige-architektur","category-news"],"_links":{"self":[{"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/posts\/1572","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/comments?post=1572"}],"version-history":[{"count":4,"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/posts\/1572\/revisions"}],"predecessor-version":[{"id":2018,"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/posts\/1572\/revisions\/2018"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/media\/1575"}],"wp:attachment":[{"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/media?parent=1572"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/categories?post=1572"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/tags?post=1572"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}