{"id":2299,"date":"2012-05-29T13:31:25","date_gmt":"2012-05-29T13:31:25","guid":{"rendered":"http:\/\/www.acegroup.at\/?p=2299"},"modified":"2012-05-29T13:31:54","modified_gmt":"2012-05-29T13:31:54","slug":"bca-bildungscampus-aspern","status":"publish","type":"post","link":"https:\/\/www.acegroup.at\/en\/bca-bildungscampus-aspern\/","title":{"rendered":"BCA Bildungscampus Aspern"},"content":{"rendered":"<p>For the Bundes Immobilien Gesellschaft, our project \u201eBildungscampus Wien Aspern Seestadt\u201c provides \u00a0an integrative and ecological solution for urban lifestyle amidst unspoiled nature, encompassing an area of approximately 50.000 square meters.<\/p>\n<p>The sustainable\u00a0building project\u00a0includes\u00a0a kindergarten, an elementary school, a school for\u00a0children\u00a0with limited\u00a0motor skills,\u00a0multi-functional\u00a0recreation areas and extensive\u00a0outdoor facilities.<!--more--><\/p>\n<p>In addition to spacious,\u00a0bright\u00a0classrooms\u00a0and\u00a0a functional\u00a0floor plan,\u00a0the spatial planning takes into account\u00a0the\u00a0special\u00a0needs of children\u00a0with limited\u00a0motor skills.<\/p>\n<p>The 18\u00a0million Euro\u00a0project\u00a0does not only impress\u00a0through its modern and sleek appearance,\u00a0but\u00a0also fulfills\u00a0contemporary planning and living standards\u00a0&#8211; \u00a0multifunctional\u00a0room structures,\u00a0such as \u00a0the media room\u00a0and library, invite\u00a0you to stay\u00a0and\u00a0offer uninterrupted views of the\u00a0landscaped\u00a0courtyard\u00a0and sports\u00a0facilities.\u00a0The clear and\u00a0timeless\u00a0shapes\u00a0of the building merge, supported by ample plantations surrounding it, harmoniously into the lush\u00a0vegetation\u00a0of the outdoor area.<\/p>","protected":false},"excerpt":{"rendered":"<p>For the Bundes Immobilien Gesellschaft, our project \u201eBildungscampus Wien Aspern Seestadt\u201c provides \u00a0an integrative and ecological solution for urban lifestyle amidst unspoiled nature, encompassing an area of approximately 50.000 square meters. The sustainable\u00a0building project\u00a0includes\u00a0a kindergarten, an elementary school, a school for\u00a0children\u00a0with limited\u00a0motor skills,\u00a0multi-functional\u00a0recreation areas and extensive\u00a0outdoor facilities.<\/p>\n","protected":false},"author":1,"featured_media":2300,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12,7],"tags":[],"class_list":["post-2299","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nachhaltige-architektur","category-news"],"_links":{"self":[{"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/posts\/2299","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/comments?post=2299"}],"version-history":[{"count":4,"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/posts\/2299\/revisions"}],"predecessor-version":[{"id":2308,"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/posts\/2299\/revisions\/2308"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/media\/2300"}],"wp:attachment":[{"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/media?parent=2299"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/categories?post=2299"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.acegroup.at\/en\/wp-json\/wp\/v2\/tags?post=2299"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}